Enhancing Efficiency and Resilience in Support of Veterans Care
Above Group’s Innovative Boiler Plant Solution for Loch Raven VA Medical Center
The Loch Raven VA Medical Center in Maryland recently identified inefficiencies in its facility operations through a comprehensive survey, revealing challenges caused by scattered boiler systems. To address these critical infrastructure needs, the VA partnered with Above Group, a trusted leader in mechanical, electrical, and plumbing (MEP) engineering design with decades of experience in healthcare and government facilities. Above Group delivered a customized boiler system solution that improved energy efficiency, improved daily functionality, and maximizes long-term value.
Read the full story in The Military Engineer (TME).


